ROW · Easement · Utility & CIP Coordination

Find route conflicts while they are still design decisions.

Research early. Document clearly. Escalate what matters.

Lunex reviews proposed telecom routes against available right-of-way, easement, utility, capital-improvement, parcel, and crossing information. The goal is to identify constraints early enough to adjust the alignment, request better data, or coordinate with the responsible stakeholder before the issue reaches the field.

Layered roadway and parcel plan highlighting a proposed fiber route and a CIP conflict area.
ROW-04Field context · design decisions · clear deliverables

The Work Behind the Drawings

Route decisions made visible.

A route that looks open on an aerial image may overlap a drainage facility, future roadway widening, private property, an existing utility corridor, or a specialty crossing with separate requirements. We bring available records into one coordinated review and document what is known, what conflicts, and what still requires confirmation.

Conflict review is not a substitute for title work, legal interpretation, utility locating, or subsurface investigation. It is an engineering-screening process that helps the project team make better routing and coordination decisions with the information available.

Capabilities

Focused support for the full design record.

01

ROW and parcel context

Available right-of-way, parcel, monument, plat, and land-line information organized around the proposed alignment.

02

Easement research

Review of available easement exhibits and record information relevant to route access, placement, and coordination.

03

CIP conflict screening

Comparison of proposed fiber work with available roadway, drainage, water, sewer, streetscape, and other capital-improvement plans.

04

Specialty crossings

Early research and exhibit support for highways, railroads, canals, flood-control facilities, bridges, and other controlled crossings.

Typical Deliverables

Clear outputs for the next decision.

Scope and formats are tailored to the owner, contractor, jurisdiction, and intended review stage.

  • ROW and parcel research exhibits
  • Easement-reference overlays
  • CIP conflict matrices
  • Utility conflict markups
  • Specialty-crossing exhibits
  • Constraint and open-item logs

How We Work

A controlled path from scope to issue.

  1. 01

    Define the review corridor

    Confirm the proposed alignment, project limits, planned structures, construction method, and known problem areas.

  2. 02

    Assemble available records

    Collect client data, public GIS, plats, easement exhibits, utility information, CIP plans, and crossing records.

  3. 03

    Screen and classify

    Identify apparent conflicts, data gaps, stakeholder coordination needs, and conditions that require field or legal confirmation.

  4. 04

    Coordinate route decisions

    Document findings, compare alternatives, update the proposed route, and carry open items into permitting or field verification.

A Good Fit For

Teams that need the design to stay practical.

  • Long routes crossing multiple land conditions
  • Areas with active roadway or utility CIP work
  • Canal, freeway, railroad, and flood-control crossings
  • Projects where land-line accuracy affects constructability

Scope note: This service is an engineering conflict review, not a legal boundary determination, title opinion, utility locate, or guarantee of subsurface conditions.

Common Questions

Straight answers before kickoff.

What is a CIP conflict review?

It compares a proposed telecom route with available capital-improvement plans—such as roadway, drainage, water, or sewer projects—to identify overlapping work, future conditions, and coordination needs.

Can Lunex determine the legal limits of an easement?

We can review and depict available record information for engineering coordination, but legal interpretation and boundary determinations must come from the appropriate legal or licensed surveying professionals.

Why review specialty crossings early?

Controlled crossings often have separate owners, design criteria, application requirements, lead times, and construction restrictions that can materially affect the route and schedule.